Fast, accurate, and compliant — so your build schedule never stops.
Reliability
On Time — Every Time
Choose the option that fits your development. All reports delivered within 48 hours of receiving full drawings.
A Building Regulations (Part L) energy-efficiency compliance check. Fast, accurate results to keep your project on schedule.
SAP and simplified overheating assessment for smaller developments or design-build projects needing fast sign-off.
Comprehensive SAP and TM59 modelling for complex or high-value residential units. Ideal for developments requiring detailed overheating routes and full Part L compliance.
Most comprehensive solution for challenging projects.
Reports delivered in two working days to keep build programmes moving and avoid costly project delays.
Transparent pricing with no hidden fees, no add-ons, and no re-quotes — total cost certainty from the start.
Every report includes SwiftScore™ — a unique score that turns complex data into clear insight, showing energy efficiency, overheating risk, and optimisation potential. This helps you make smarter, compliant design decisions. Add overheating or water analysis for even greater accuracy.
Focused exclusively on residential compliance for 1–15 unit projects, with over 500 UK projects successfully delivered.
Speak directly with a qualified Elmhurst assessor who understands your project — not a call centre or admin team.
Ideal for developers and air-testing companies seeking a dependable long-term compliance partner who helps keep projects on track.
Initial SAP fail due to high U-values; passed after insulation redesign.
Two-unit conversion of an existing office building into flats in South Yorkshire.
Initial SAP assessment failed to meet Part L targets.
U-values for walls, roof, and floor exceeded limits because of insufficient insulation thickness and product specification.
Both units achieved Part L compliance with a comfortable margin.
Total turnaround time: 48 hours from revised specification submission.
Project type: Conversion / change of use (demonstration example)
Software: DesignBuilder / SAP 10.2
Accreditation: Elmhurst OCDEA
"This demonstration example illustrates SwiftSap's workflow and problem-solving process."
TM59 Overheating fail resolved with solar glazing and MVHR solution.
Three-unit new-build residential development with large south-facing glazing and compact bedroom layouts.
TM59 overheating analysis showed non-compliance: bedrooms and kitchen–living rooms exceeded temperature limits under typical summer conditions.
All spaces achieved TM59 compliance; annual hours of overheating reduced below threshold.
Total turnaround time: 48 hours from design update.
Project type: New-build residential (demonstration example)
Software: DesignBuilder / TM59 method
Accreditation: Elmhurst Overheating Assessor
"This demonstration example illustrates SwiftSap's reporting style and resolution approach."
Fast, reliable compliance reports with 48-hour delivery. Fill out the form below and we'll respond within 2 hours.
✓
Compliance Delivered
✓
On Time — Every Time
48
Hours Turnaround
Fill out the form below and we'll get back to you within 2 hours.